Harbor_Park

harbor park pavilion

LOCATION / BOSTON, MA
ARCHITECT / UTILE INC.
CONTRACTOR / TURNER CONSTRUCTION

CW Keller, in conjunction with S&F Concrete, Utile, Turner Construction and Simpson Gumpertz & Heger Engineers, engineered the form structure for two 40’ x 60’ undulating cast-in-place concrete canopies.   Our 3D model provided S&F with the information to integrate its shoring system with our undulating form system. CW Keller prefabricated a rib and form liner assembly for the field team to erect on site. Form liners were pre-cut and drilled to create a seam pattern that accentuates the complex geometry of the final cast in place canopy.

 

Photos courtesy of Chuck Choi.